Appendix 1-1 (Engineering Feasibility Report)
Appendix 3-1 (Transport Modelling Report)
Appendix 3-2 (Existing Road Geometry Assessment)
Appendix 5-1 (Reference Case Schemes)
Appendix 7-1 (Stage 2 Project Appraisal Matrix Sub-Scheme Drawings)
Appendix 8-1 (Revised Design Basis)
Appendix 8-2 (Long-list Options Assessment, Sub-Scheme B, J6-J7)
Appendix 8-3 (Long-list Options Assessment, Sub-Scheme B, J7-J8)
Appendix 8-4 (Long-list Options Assessment, Sub-Scheme C, J8-J9)
Appendix 8-5 (Stage 2A Appraisal, Sub-Scheme B, J6-J7)
Appendix 8-6 (Stage 2A Appraisal, Sub-Scheme B, J7-J8)
Appendix 8-7 (Stage 2A Appraisal, Sub-Scheme C, J8-J9)
Appendix 8-8 (Stage 2 Project Appraisal Matrix Drawings)
Appendix 8-9 (Post Consultation Report – September 2023)
Appendix 8-10 (Public Display Drawings – September 2023)
Appendix 9-1 (Glencullen River Spring Survey)
Appendix 9-2 (Junction 7 Signalised Junction Traffic Analysis)
Appendix 9-3 (Stage 2A Options Drawings)
Appendix 9-4 (Stage 2 Project Appraisal Matrix Drawings)
Appendix 10-1 (Preferred Option Scheme Layout Drawings)
